
High Street Preston: The Quality Behind the Finished Build
Inside High Street Preston, we look at the decisions, processes and testing that helped build quality into the project from the outset.
Kapitol are the first builders to use the newly developed S-Connection product from PSA Group 🌟
The S-Connection is a game changing panel-to-panel connective device which helps increase the speed at which panels are connected. This connector is currently being used at our Tungs site, a 13-level mixed-use development with residential apartments, commercial office space and ground-floor retail space.
Watch this video below to learn more about how PSA and Kapitol have collaborated to use this innovative product to build the best buildings more quickly, efficiently and safely.