
Micropiling works underway at District Docklands
Micropiling works are now underway at District Docklands, strengthening an existing operational building through carefully planned foundation works.

In this video we speak with our Senior Design Managers Kevin Hogan and Michael Nunn about the checks and balances we conduct at the design phase to ensure quality issues are resolved before we start constructing a building.
Our design team is responsible for identifying risks in a design package as we inherit it from our clients. It’s a critical step for ensuring that when the design is passed onto our project teams, there aren’t delays due to insufficient detailing, wrong material selections, and code compliance.
Watch below to find out more about the ‘red stick process’, and how the Kapitol design team uses digital technology such as BIM 360 to take a deeper dive into a building design before it gets to the 2D stage >>>
Video: Humdinger